Yau Ma Tei Mong Kok project or introduction

Yau Ma Tei Mong Kok project or introduction

The URA has a number of major redevelopment projects. Wei Zhicheng revealed in the blog that he is studying redevelopment projects in Yau Ma Tei and Mong Kok to explore the use of underground intelligent parking systems and different modes. He will also study the intelligent underground parking lots at different locations in the district. The connection of the underground passages will reduce the traffic load on the road and provide a more convenient experience for the drivers. This means that the URA has a great opportunity to introduce the “electronic flying felt” parking system in the Yau Wan Redevelopment Project.

Kwun Tong underground floor plane mobile

The Chairman of the Yau Tsim Mong District Council, Ye Ao-dong, welcomed the suggestion of the URA that the demand for parking spaces in the district would be strong and that the Yau Ma Tei Carpark Building would be demolished. It is expected to reduce about 700 parking spaces. If the use of the underground intelligent parking system in the district will help save space, the actual planning may be quite challenging, including the need to solve more underground tunnels and MTR tunnels.

In addition to the oil boom, Wei Zhicheng also revealed that the fourth and fifth phase of the reconstruction project in Kwun Tong District, namely the Yue Man Square area, including the reconstructed goose egg-shaped design building, due to the large area, reached 18,500 square meters, and the upper cover There is a system building, the bureau research team believes that it is suitable to adopt the plane mobile mechanical automatic parking scheme. Only two to three parking layers need to be built in the ground. There are mechanical lifting devices in different positions in the left, middle and right places of the field. Send to the parking floor.

The layout of the lifts and parking spaces on each floor can be adjusted according to the design requirements of the parking lot entrance and exit of the project, the planning of the ground road, and the distribution of foundation piles. However, Wei did not reveal in the blog whether he would eventually adopt this plan.