Yiyi Bay 8 slamming diamonds will be sold as soon as next week

Yiyi Bay 8 slamming diamonds will be sold as soon as next week

Tai Po Pak Shek Kok will soon be launched in a new market. The Yi Yu Wan 8 developed by the Trust (083) has been posted on the past Saturday and opened in Olympian City on Sunday. The demonstration unit of the period is for prospective buyers to visit and implement the quick-play strategy, so as not to be robbed of the limelight by the China Overseas (688). Tian Zhaoyuan, co-director of the company’s sales department, said that the first price list is in the process of preparation, and the plan will be announced soon, and the market will be officially opened as soon as next week.

3.4 meters at the bottom of the unit

Tian Zhaoyuan continued to refer to the first batch of 108 gangs to be launched, focusing on two-bedroom and three-bedroom units. For pricing reference, the residential area in Baishijiao District will be used as a reference, because Baishijiao is a pure residential area and takes the luxury residential route. At the same time, he indicated that he would refer to the price list launched by Jiaxi in May last year and Yunhui in July, with a discount of 16.4 million and 173,000 yuan respectively.

Referring to the merits of the project, he said that all units have a 3.4-meter-high floor, and the characteristic unit floor will be a little higher, and this height is called the crown of the Baishijiao District. The project is adjacent to the Science Park. In line with the image of the district, the Group also injects smart elements into the home design; some 4 and 3 bedroom units enjoy the view of Tolo Harbour.

Yi Yi Wan 8 is located at No. 1 Research Road, Pak Shek Kok. It consists of 3 residential buildings with a total of 528 gangs. In terms of floor space, 50% is three-bedroom, two-bedroom is 34%, four-bedroom is 8%, and the practical area is between 490 and 1238 square feet. There are also 22 groups of underground garden features, and 22 penthouses with roof or platform features. Household. Like the Yiyi Bay I and II in the same district, the project takes the luxury residential route and is expected to be completed in early 2021.